Friday, August 29, 2014

Planing out


 This is the pained out steps that will be taken for the whole thing. There's nothing that I want to share or give tips about, so Enjoy looking at my steps.

August 22 2014:
-       Storyboard done
-       Start work on getting the frames for the start, these need to be fully built within the next few days.

 August 29 2014:
-       All the background for the frames are set/made.
-       The showing of the “place where his sword need to be jammed in and glows” is done. (I’m not here to make cool names, sorry. I’ll forget it if I don’t spell it out)

September 5 2014:
-       plain out how the “door” will open that both looks right and doesn’t  look to big. and doesn't look stupid opening
-       Make the “steps show up” frame. (Fun fact: this used to be a place coved in water before the ice and snow)

September 10 2014:
-       Built the door and show him walking to/into it.
-       Start work on his pulling out the sword and getting ready plunge it in the key slot

September 13 2014:
-       “Sword key” frame is done and ready
-       Short brake for the weekend/work on stuff I’m behind on

September 15 2014:
-       start work on the in-between shots.

September 19: 2014:
- gets all the in between shots down
-start work on the "found" frames

September 24 2014:
-       keep working on stuff that isn’t done
-       Start putting it together